Lake Turkana Wind Power Limited

  • Active: Active
  • Region: Africa
  • Country: Kenya
  • Sector: Energy - wind
  • Year: 2013
  • Domicile: Kenya
  • Instrument: Equity
  • Commitment (MNOK) as of 30.06.2019: 97.3
  • Original Commitment (MNOK): 111.2

wind mills

The Lake Turkana Wind Power Project (LTWP) aims to provide 310MW of reliable, low-cost wind power to the Kenya national grid, equivalent to approximately 20% of the current installed electricity generating capacity.  The Project is of significant strategic benefit to Kenya, and at more than €620 million will be the largest single private investment in Kenya’s history.  The wind farm site, covering 40,000 acres (162km2), is located in Loyangalani District, Marsabit West County, in north-eastern Kenya, approximately 50km north of South Horr Township.

A complex project

The project will comprise 365 wind turbines (each with a capacity of 850 kW), the associated overhead electric grid collection system and a high voltage substation.  The Project also includes upgrading of the existing road from Laisamis to the wind farm site, a distance of approximately 204km, as well as an access road network in and around the site for construction, operations and maintenance.

The Kenya Electricity Transmission Company Ltd (Ketraco) is constructing a double circuit 400kv, 428km transmission line to deliver the LTWP electricity along with power from other future plants to the national grid.

The power produced will be bought at a fixed price by Kenya Power (KPLC) over a 20-year period in accordance with the signed Power Purchase Agreement (PPA). 

Norfund’s investment in LTWP is done through KLP Norfund Investments AS.

In August 2019, Lake Turkana Wind Power was officially inaugurated by the President of Kenya. Read more here. 

 

Norfund - The Norwegian Investment Fund for Developing Countries

Fridtjof Nansens Plass 4
N-0160 Oslo

Subscribe to our newsletter